Gibraltar's new primary crusher being commissioned 28 KB, approx. 6 seconds at 56.6Kbps |
|
Gibraltar's new primary crusher/conveyor system 27 KB, approx. 6 seconds at 56.6Kbps |
|
Gibraltar's new conveyor system from in-pit crusher to mill 32 KB, approx. 7 seconds at 56.6Kbps |
|
Construction of Gibraltar's new, in-pit primary crusher 29 KB, approx. 6 seconds at 56.6Kbps |
|
Gibraltar's new P&H 4100 shovel being commissioned 58 KB, approx. 12 seconds at 56.6Kbps |
|
October 2/07 -- Assembly of the SAG mill 28 KB, approx. 6 seconds at 56.6Kbps |
|
October 1/07 -- Assembly of the SAG mill 34 KB, approx. 7 seconds at 56.6Kbps |
|
September 27/07 -- Assembly of the SAG mill 30 KB, approx. 7 seconds at 56.6Kbps |
|
September 14/07 -- Arrival of the SAG mill components to Gibraltar 32 KB, approx. 7 seconds at 56.6Kbps |
|
August 21 - Five new copper cleaner float cells, in the process of being installed 17 KB, approx. 4 seconds at 56.6Kbps |
|
August 21 - Construction of high angle conveyor belt which will feed ore to the SAG mill, fine ore bin in the background 14 KB, approx. 4 seconds at 56.6Kbps |
|
August 15 - The SAG mill shells, loaded and departing Europe for Montreal. 23 KB, approx. 5 seconds at 56.6Kbps |
|
August 13 - Inside the SAG mill facility, preparations for the SAG mill installation are well underway 51 KB, approx. 10 seconds at 56.6Kbps |
|
August 13 - The SAG mill shells, at the Port in Europe being prepared for loading 47 KB, approx. 10 seconds at 56.6Kbps |
|
August 5 - Key SAG mill component, the ring gear, loaded in the hold, ready for shipping from Europe 51 KB, approx. 11 seconds at 56.6Kbps |
|
July 31 - Installing the trunions that will support the SAG mill 71 KB, approx. 14 seconds at 56.6Kbps |
|
July 31 - The near complete SAG mill building 59 KB, approx. 12 seconds at 56.6Kbps |
|
July 21 - The recently completed flotation circuit, 10 new, 160 m3 cells, operating as of mid-July 37 KB, approx. 8 seconds at 56.6Kbps |
|
June 30 - Loading of key SAG mill components in Rotterdam 31 KB, approx. 7 seconds at 56.6Kbps |
|
May/07 - SAG Mill building construction and installation of the crane. T his building, which will house the SAG Mill, is over 16,000 square feet in size and 80 feet high. 122 KB, approx. 24 seconds at 56.6Kbps |
|
April/07 -- Phase 2 of the concentrator modernization is the installation of 4 new float cells. 30 KB, approx. 7 seconds at 56.6Kbps |
|
April/07 -- Construction of the building which will house the SAG mill 29 KB, approx. 6 seconds at 56.6Kbps |
|
April/07 -- Construction of the building which will house the SAG mill 20 KB, approx. 5 seconds at 56.6Kbps |
|
February/07 -- Original flotation circuit, 96 cells in 3 banks to be replaced with 10 state-of-the-art float cells. 36 KB, approx. 8 seconds at 56.6Kbps |
|
February/07 -- Granite Lake Pit -- stripping operations restarted in this pit in September 2006 22 KB, approx. 5 seconds at 56.6Kbps |
|
February/07 -- Current mining operations, Pollyanna Pit 34 KB, approx. 7 seconds at 56.6Kbps |
|
Feb/07 -- erecting forms at the SAG mill building 40 KB, approx. 8 seconds at 56.6Kbps |
|
Feb/07 -- Concrete forms in preparation for an upcoming pour 39 KB, approx. 8 seconds at 56.6Kbps |
|
Feb/07 -- Key SAG mill components, currently being fabricated and assembled in Spain 44 KB, approx. 9 seconds at 56.6Kbps |
|
Feb/07 -- Key SAG mill components, currently being fabricated and assembled in Spain 128 KB, approx. 25 seconds at 56.6Kbps |
|
Feb/07 -- SAG mill discharge screen, awaiting shipment to Gibraltar from Pennsylvania 35 KB, approx. 8 seconds at 56.6Kbps |
|
Jan/07 -- First copper cathode being harvested from the restarted SX-EW plant at Gibraltar 30 KB, approx. 7 seconds at 56.6Kbps |
|
Jan/07 -- First copper cathode being harvested from the restarted SX-EW plant at Gibraltar 25 KB, approx. 6 seconds at 56.6Kbps |
|
Jan/07 -- First copper cathode being harvested from the restarted SX-EW plant at Gibraltar 28 KB, approx. 6 seconds at 56.6Kbps |
|
MT 3700 205 ton haul truck 31 KB, approx. 7 seconds at 56.6Kbps |
|
Gibraltar Mine 23 KB, approx. 5 seconds at 56.6Kbps |
|
Overhead view of Gibraltar mine, Granite Lake pit in foreground 22 KB, approx. 5 seconds at 56.6Kbps |
|
Fine ore bin 21 KB, approx. 5 seconds at 56.6Kbps |
|
October/06 -- Laying the foundation for the SAG mill 68 KB, approx. 14 seconds at 56.6Kbps |
|
October/06 -- Laying the foundation for the SAG mill 135 KB, approx. 26 seconds at 56.6Kbps |
|
September/06 -- Breaking ground on the mill expansion project 27 KB, approx. 6 seconds at 56.6Kbps |
|
August/06 -- Construction of the first of ten, new float cells 29 KB, approx. 6 seconds at 56.6Kbps |
|
May/06 -- Laying the foundation for the first float cell 25 KB, approx. 6 seconds at 56.6Kbps |
|
March/04 -- Assembly of the new P&H 2800XPB shovel, purchased for the restart of Gibraltar in 2004 26 KB, approx. 6 seconds at 56.6Kbps |
|
March/04 -- Assembly of one of the new, Terex MT3700, 205 ton trucks purchased for the restart in 2004 22 KB, approx. 5 seconds at 56.6Kbps |